/ /

How Orum pulls call tasks from each integration

If a call task is showing up in a different Orum list than you expected, or if some due tasks seem missing, the reason is often how the connected platform returns tasks to Orum. Orum does not use the exact same task-loading logic for every integration. The source system’s sorting, filtering, and API limits affect what appears in Orum first.
Updated 9 days ago

How Orum pulls call tasks from each integration

If a call task is showing up in a different Orum list than you expected, or if some due tasks seem missing, the reason is often how the connected platform returns tasks to Orum.

Orum does not use the exact same task-loading logic for every integration. The source system’s sorting, filtering, and API limits affect what appears in Orum first.

What this article explains

  • How Orum pulls tasks from HubSpot, Outreach, Salesloft, and Salesforce

  • Why a task may appear in one Orum list but not another

  • Why a task can be due in your source system but still not be easy to find in Orum

  • What to try before contacting Support

First, a quick reminder

For task-based workflows, Orum typically expects the task to be:

  • A call task

  • Assigned to the rep who is dialing

  • Due now or past due if the source system uses task due dates for eligibility

For broader troubleshooting steps, see:

How task pulling works by integration

Integration

How tasks are pulled in Orum

What to expect

Salesforce

Orum follows the report’s own sorting and filtering.

If the report order changes, Orum follows that order.

Outreach

Orum pulls currently due tasks, but Outreach does not return them in a fixed order.

A task may not appear in a predictable oldest-to-newest order.

Salesloft cadence actions

Orum pulls currently due cadence actions and Salesloft sorts them by last modified date, newest first.

Recently changed actions may appear before older ones.

Salesloft one-off tasks

Orum pulls currently due one-off tasks and Salesloft sorts them by due date, newest first.

One-off tasks can behave differently from cadence tasks.

HubSpot tasks

HubSpot tasks are sorted by last modified date, newest first. Orum then applies the due-date filter after retrieving the first batch of tasks.

A due task may not appear in All Due Tasks if many more recently modified tasks are ahead of it.

HubSpot lists

HubSpot contact lists use HubSpot’s own default sorting.

List order comes from HubSpot, not Orum.

Why tasks may show up in different Orum lists

A task can be real, assigned correctly, and due now, but still show up in a different Orum list than you expected.

Common reasons include:

  • The task belongs to a different sequence, cadence, report, or source list than the one you are checking

  • The source platform returns tasks in a different order than you expect

  • A broad “all due” view contains more tasks than can be surfaced at once

  • A platform separates sequence/cadence tasks from one-off/manual tasks

This is why a task can sometimes be visible in a more specific list, but harder to find in a broader catch-all list.

Special note for HubSpot admins

HubSpot behaves differently from some other integrations.

For HubSpot tasks:

  • Tasks are sorted by last modified date, newest first

  • Orum retrieves tasks in a limited batch first

  • The due-date filter is applied after retrieval, not before

In practice, this means a task can be due in HubSpot but still not appear where you expect in Orum if a large number of more recently modified HubSpot tasks are returned first.

If your team is relying on a broad list like All Due Tasks, this behavior is more likely to matter.

Special note for Outreach and Salesloft

Outreach and Salesloft can also create confusion, but for different reasons:

  • Outreach does not provide a fixed, reliable oldest-to-newest order for task retrieval

  • Salesloft handles cadence actions and one-off tasks differently, so the same rep may need to check the correct task type and list

Steps to try:

  1. Refresh the current list in Orum

  2. If needed, use Reset to pull the latest tasks again from the connected platform

  3. Confirm the task is:

    • assigned to the correct rep

    • a call task

    • due now or overdue, when applicable

  4. Check whether the task belongs to a more specific sequence, cadence, report, or HubSpot list rather than a broad all-tasks view

  5. If you are in HubSpot, compare the result in:

    • the broad due-task view

    • the specific source list or task grouping you expect the task to belong to

Common questions

Why is my task visible in HubSpot but not in All Due Tasks in Orum?

If you use HubSpot, this can happen because HubSpot returns tasks by last modified date, and Orum applies due-date filtering after retrieving the first batch of tasks.

Why do tasks seem to move between lists?

Tasks usually are not moving randomly. More often, they belong to a different underlying sequence, cadence, report, or task type than the list you are checking.

Does Reset fix task ordering?

Reset is useful for re-pulling tasks, but the ordering and task-selection behavior still depends on the integration you are using.


Was this article helpful?